Case Study  Rolls-Royce, New Production & Process Facility at Filton, Bristol

Phase 2 Redevelopment at Filton Bristol comprised the design and construction of a new production/process facilty and office accommodation.

The steel framed structure is founded on reinforced concrete pads with a suspended fibre mesh concrete ground floor slab including a precast concrete edge beam. Upper floors are metal deck with reinforced insitu concrete, serviced by precast concrete staircases.

The roof is an aluminium standing seam built up system and the external envelop is a composite cladding system. Curtain walling systems are incorporated into the works.

The mechanical and electrical installation incorporated an innovative low level displacement ventilation system that alleviates the need for a cooling system.

Employer’s Agent

Rolls Royce FSM

PO BOX 3
Filton, Bristol
BS34 7QE

Architect

Hemingway Architects

49 Queen Square
Bristol
BS1 4LW

Value - £21,000,000
Contract Period - 43 weeks
Completion - November 2007
Contract Type - JCT 1998 with Contractors Design
Area - 230 K sq ft