Health
Case Study New Cross Hospital, Wolverhampton
The works consist of the construction of a new build radio diagnostic unit for New Cross Hospital.
The fabric is a steel frame building on pile foundations, with a variety of cladding to the elevations.
Internally the building will be fully serviced, drylined walls, lay in ceilings, 2 no. bed sized lifts, with access to the tugway / plantrooms and there is a two storey bridge link to connect the new build to existing covered ways.


Architect
R.T.K.L.
22 Torrington Place
London
WC1E 7HP
Structural Engineer
White Young Green
Portland House
22-24 Portland Square
Bristol, BS2 8RZ
Value - £6,250,000
Contract Period - 65 weeks
Contract Type -
Bespoke PFI type
Area - 5,000 m2